Goal
Inspect the chassis, battery, power module and harnesses before first power-on.
Procedure
- Check connectors, fasteners and polarity.
- Charge the battery with the specified charger.
- Connect regulated power before connecting the host computer.
- Test each rail with a multimeter.
Verification
Record the command output, confirm the expected ROS 2 topic or behaviour, and resolve power, TF and device-permission errors before continuing.